Fire Resistant Safety Cabin Provides 90 Minutes Fire Resistance

Download

Fire Resistant Safety Cabin Provides 90 Minutes Fire Resistance

 

 


Fire-resistant room for the storage of large quantities of hazardous materials and the enclosure of production facilities in operation. The 42 mm construction method of prefabricated panels results in fast and cleanly built separated fire compartments. Benefits: chemically highly stable internal and external surfaces, simple construction, reconstruction and extensions. The room always has a threshold-free access and can be equipped with standard drip pans according to the provisions of the Federal Water Act. The room provides 90 minutes fire resistance.

 

Function
Fire resistance 90 minutes: fire resistant
EI 90/F 90 classification
Fire chamber test, according to DIN 4102-2

 

Construction
Room with high mechanical and chemical resistance
Barrier-free access with pallets, drums and compressed gas cylinders
Door(s) with 3D stainless steel strips, 3-point locking system, prepared for profile cylinder
Suitable for the storage and removal of flammable liquids, acids and alkalis
Room may be equipped with lighting, ventilation equipment, racks and drip pans
Delivered on pallets, assembly on site

 

Material characteristic
Building material with surface coating on both sides, classified A2 – s1, d0 non-combustible
Standard surface CP laminate is chemically highly stable and moisture-resitant
Colour light grey, similar to RAL 7035, edges and bevels in different colour 

 

Options
Doors or entire body in alternative RAL colours / surfaces, see pages 16/17
Stainless steel encasement in V4A 1.4571
Design with anti-burglary protection according to WK 2
Smoke proof
Ventilation flap
Fire resistant cable compartment
Door hold-open device
Explosion protected smoke detector
Door handles, locking cylinder
Door damper
Door closer for single leaf doors
Door closer for double leaf doors
Motor lock
Panic hardware with panic function B
Electronic door closing systems


PRIOROOM GSL is offered on a project-by-project basis